Manufacturing Process

Our Manufacturing Process

  • Quality Structure Built-in
    • Standard Operating Procedures (SOPs)
    • Materials Requirements Planning (MRP) software
    • Manufacturing Instructions Quality Travelers (MIQT)
    • Work Cells / Work Stations based
  • Resourced and Staffed with the ability to move to 5x24 shift
    • Experienced Staff New and Rebuild of RDS and IGEN-x
    • Production line designed to increase output
  • Approved Line of Credit

Every Pump at Dispense Applications has the following replaced:
  • All surfaces (PTFE) in contact with your process (complete chemical path)
    • Virgin PTFE (As OEM)
    • UHP PTFE Tubing
    • Diaphragms
    • All Seals and O-Rings (both Pneumatic and Chemical)
    • PTFE Fittings
  • Hydraulic Drive Motor
    • Same as OEM (OEM is not a mandatory replacement)
    • High viscosity fluids tend to weaken pump
  • Calibration for Dispense Quantity
    • Hydraulic Fluid (and calibration of the chamber)
  • All other components are verified for Functionality, Accuracy, and Repeatability
    • Replaced as required